Planning & development

Heritage rules affect my property or project

Heritage protection in New South Wales operates at several levels at once: the State Heritage Register, local environmental plan listings, interim protections and a separate regime for Aboriginal cultural heritage. Each carries its own approval requirements, and works done without them can attract orders and significant penalties.

Jurisdiction
New South Wales
Page type
Issue overview
On this page

If you have received a decision or notice, a strict review or appeal period may already be running. Confirm it promptly and do not rely on an online enquiry.

This page may be relevant if:

  • Your property is on the State Heritage Register or a local heritage list
  • You want to alter, extend or demolish a listed or potentially listed building
  • An interim heritage order or proposed listing has been made
  • Your project area may contain Aboriginal objects or places

What this usually means

  • Works affecting an item on the State Heritage Register generally need approval under the Heritage Act 1977, although standard exemptions cover a range of maintenance, repair and minor works.
  • Proposed alterations may require development consent under the applicable local environmental plan. A heritage assessment or conservation management plan may also be required.
  • An interim heritage order can protect a building or place at short notice while its significance is assessed, and stops most works while it is in force.
  • Aboriginal objects and declared Aboriginal places are protected under the National Parks and Wildlife Act 1974 (NSW). The proposed harm, available defences or exemptions and project pathway determine permit requirements. Due diligence is a limited defence for specified Aboriginal-object offences; it is not general permission to harm Aboriginal heritage.

What commonly matters

  1. The level of listing

    State, local and interim protections carry different approval pathways and different decision-makers; the first task is establishing exactly what applies.

  2. Scope of the works

    Exemptions and minimum-standards obligations mean some works can proceed and some are required; the line needs to be drawn precisely.

  3. Evidence of significance

    Heritage outcomes usually turn on expert assessment of significance and impact, and the right consultant brief is decisive.

  4. Aboriginal cultural heritage

    Due diligence before ground disturbance protects both heritage and the project; permits take time and are best sequenced early.

How we help

  • Confirm the listings and controls that apply to the property
  • Advise on approval pathways, exemptions and maintenance obligations
  • Coordinate heritage consultants and prepare or respond to applications
  • Act on interim heritage orders, proposed listings and enforcement

This page is general information only and is not legal advice. It may not be current, and how the law applies depends on the specific facts. For advice on your situation, contact Stone & Pillar Legal.

Frequently asked questions

General information only, not legal advice. The position depends on your circumstances.

My building is on the State Heritage Register. Can I still renovate it?

Renovation may be possible, depending on the listing, proposed work and effect on heritage significance. Establish the approval or exemption pathway and supporting evidence before committing to the design.

What is an interim heritage order and how long does it last?

An interim heritage order temporarily protects a building, place or other item while its heritage significance is assessed. It generally takes effect on Gazette publication and lasts 12 months, or a shorter period specified in the order, unless revoked sooner. An affected owner or occupier may appeal a council-made order to the Land and Environment Court, generally within 28 days after it takes effect. An appeal does not itself stay the order. While the order is in force, work may require approval, and the assessment can lead to permanent listing, so the order and proposed work should be checked promptly.

Do I need an Aboriginal heritage permit before earthworks on my site?

Aboriginal objects and declared Aboriginal places are protected under the National Parks and Wildlife Act 1974 (NSW). The proposed harm, available defences or exemptions and project pathway determine permit requirements. Due diligence is a limited defence for specified Aboriginal-object offences; it is not general permission to harm Aboriginal heritage.

Where to start

Discuss the heritage issue affecting your plans

Start with a brief outline of the heritage issue and its effect on your plans. On a short preliminary call we can tell you whether we can assist and what the first step would be.