Notice Decoder
Identify the notice you have received.
Councils, planning authorities, the EPA, NRAR, Transport for NSW and acquiring authorities issue different notices under different laws. Find yours to see what it is, who issues it and the law it comes under, then what to do next.
- 1 Identify the notice
- 2 Preserve what it states
- 3 Route it into the Matter Navigator
Or choose who sent it
62 kinds of notice
Council orders & local government10
Notice of intention to give a development control orderCouncil orders & local governmentLocal council or planning authority
A preliminary notice proposing a development control order and inviting representations before the order is given.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5
TimingTime limits commonly apply. Check the dates on the notice.
Development control orderCouncil orders & local governmentLocal council or planning authority
An order requiring or prohibiting specified development, use, building, safety or compliance action.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5
TimingTime limits commonly apply. Check the dates on the notice.
Stop work orderCouncil orders & local governmentLocal council or planning authority
An order requiring work, or work of a specified kind, to stop.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Demolish works or repair orderCouncil orders & local governmentLocal council or planning authority
An order requiring a building to be demolished or removed (a demolish works order), or repaired or structurally altered (a repair order).
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Fire safety order or noticeCouncil orders & local governmentLocal council or Fire and Rescue NSW (an authorised fire officer)
A notice or order concerning fire safety measures, building upgrading or immediate safety risks. A fire safety order given by an authorised fire officer cannot be appealed under section 8.18 unless it prevents a person using or entering premises.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5, Part 2, and applicable regulations
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Notice of a proposed Local Government Act orderCouncil orders & local governmentLocal council
A notice proposing a Local Government Act order. Where section 132 applies, the notice must explain the opportunity to make representations about whether the order should be given, its terms or its compliance period; section 129 provides exceptions to that procedure.
Comes under: Local Government Act 1993 (NSW), Chapter 7
TimingTime limits commonly apply. Check the dates on the notice.
Local Government Act order (section 124)Council orders & local governmentLocal council
An order requiring something to be done, or to stop, concerning premises, public health, waste, animals, water, sewerage or another local-government function.
Comes under: Local Government Act 1993 (NSW), section 124
TimingTime limits commonly apply. Check the dates on the notice.
Council compliance cost noticeCouncil orders & local governmentLocal council
A notice requiring payment of reasonable costs of investigating, monitoring or securing compliance with a development control order. An appeal may generally be brought within 28 days after service, or lodged with an appeal against the order under section 8.24(2).
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5, Part 12
TimingTime limits commonly apply. Check the dates on the notice.
Demand for the cost of work the council carried outCouncil orders & local governmentLocal council
An invoice or demand for the cost of work the council carried out itself after an order was not complied with.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Schedule 5, Part 11, or Local Government Act 1993 (NSW), section 678
TimingTime limits commonly apply. Check the dates on the notice.
Council penalty notice for a planning or building offenceCouncil orders & local governmentLocal council
A penalty notice (a fine) from the council alleging a planning or building offence, such as unauthorised development or a breach of a consent.
Comes under: Environmental Planning and Assessment Act 1979 (NSW) and the fines legislation identified in the notice
TimingTime limits commonly apply. Check the dates on the notice.
Planning decisions & compliance9
Development application refusalPlanning decisions & complianceConsent authority or local council
A formal determination refusing a development application.
Comes under: Environmental Planning and Assessment Act 1979 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Deemed refusal or delayed determinationPlanning decisions & complianceConsent authority or local council
An application that may be treated as refused because it was not determined within the applicable assessment period.
Comes under: Environmental Planning and Assessment Act 1979 (NSW) and Environmental Planning and Assessment Regulation 2021 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Development consent with unacceptable conditionsPlanning decisions & complianceConsent authority or local council
A consent granted subject to conditions that may materially affect feasibility, design, timing or use.
Comes under: Environmental Planning and Assessment Act 1979 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Modification application refusedPlanning decisions & complianceConsent authority or local council
A decision refusing an application to modify an existing development consent. The modification pathway must be identified: Part 8 review and appeal provisions do not apply to a modification under section 4.55(1), including a modification with no environmental impact.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), section 4.55, or section 4.56 for a consent granted by the Court
TimingTime limits commonly apply. Check the dates on the notice.
Modification approved with unacceptable conditionsPlanning decisions & complianceConsent authority or local council
A decision approving an application to modify a development consent, subject to conditions that may materially affect feasibility, design, timing or use. Part 8 review and appeal provisions do not apply to a modification under section 4.55(1), including one with no environmental impact; the modification pathway must be checked.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), section 4.55, or section 4.56 for a consent granted by the Court
TimingTime limits commonly apply. Check the dates on the notice.
Complying development certificate (CDC) refused or disputedPlanning decisions & complianceCouncil or registered certifier
A refusal of a complying development certificate, or a dispute about one that has been issued. Part 8 of the Act gives no right of review or appeal against the determination of an application for a complying development certificate, or a failure to determine one; proceedings questioning the validity of a certificate that has issued are a separate matter. Section 4.31 permits an invalidity declaration for an unauthorised certificate where proceedings are brought within three months after issue, without limiting the Court's other powers. Section 4.59 separately bars validity challenges outside three months after compliant public notice.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Division 4.5
TimingTime limits commonly apply. Check the dates on the notice.
Construction, occupation or subdivision certificate refused, or a dispute with the certifierPlanning decisions & complianceCouncil or registered certifier
A refusal of a construction, occupation or subdivision certificate, or a dispute with the certifier who decides it, whether a registered certifier or the council.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Part 6
TimingTime limits commonly apply. Check the dates on the notice.
Building information certificate refused, or a council notice about onePlanning decisions & complianceLocal council
A council decision refusing a building information certificate, or a council notice asking for more information about the application.
Comes under: Environmental Planning and Assessment Act 1979 (NSW), Division 6.7 (sections 6.22–6.26)
TimingTime limits commonly apply. Check the dates on the notice.
Planning compliance investigation or information requestPlanning decisions & complianceCouncil, Department of Planning or other planning authority
Correspondence alleging unauthorised development or a breach of consent, or requiring information before any enforcement action.
Comes under: Environmental Planning and Assessment Act 1979 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
EPA & pollution regulation13
Clean-up noticeEPA & pollution regulationNSW EPA, council or another appropriate regulatory authority
A notice requiring specified clean-up action in response to a pollution incident.
Comes under: Protection of the Environment Operations Act 1997 (NSW), section 91
TimingTime limits commonly apply. Check the dates on the notice.
Prevention noticeEPA & pollution regulationNSW EPA, council or another appropriate regulatory authority
A notice requiring preventive action where an activity has been or is being carried on in an environmentally unsatisfactory manner.
Comes under: Protection of the Environment Operations Act 1997 (NSW), section 96
TimingTime limits commonly apply. Check the dates on the notice.
Prohibition notice or direction to cease an activityEPA & pollution regulationThe Minister, on the recommendation of the NSW EPA
A written direction from the Minister, on the EPA's recommendation, requiring an activity or a specified aspect of it to cease for any period stated in the notice.
Comes under: Protection of the Environment Operations Act 1997 (NSW), section 101
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Noise control notice, direction or abatement instrumentEPA & pollution regulationNSW EPA, council or other regulatory authority; police or another authorised person (noise abatement direction); or the Local Court (noise abatement order)
A notice or direction regulating offensive noise from premises, plant, vehicles or activities.
Comes under: Protection of the Environment Operations Act 1997 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Notice requiring information, records or answersEPA & pollution regulationNSW EPA or another regulatory authority
A compulsory notice requiring information, documents, records or answers as part of an investigation.
Comes under: Protection of the Environment Operations Act 1997 (NSW), sections 191–194 (information and records) and section 203 (answers to questions)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Interview request or compelled attendance noticeEPA & pollution regulationNSW EPA or investigating authority
A request or requirement to attend an interview or answer questions during an environmental investigation. Whether attendance or answers are compulsory, and the statutory warnings and protections that apply, must be checked.
Comes under: Protection of the Environment Operations Act 1997 (NSW), sections 203 and 212
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Penalty notice or fineEPA & pollution regulationNSW EPA, council or another authorised authority
A penalty notice alleging an environmental offence.
Comes under: Protection of the Environment Operations Act 1997 (NSW) and applicable regulations
TimingTime limits commonly apply. Check the dates on the notice.
Formal warning or official cautionEPA & pollution regulationNSW EPA, council or another appropriate regulatory authority
A written warning, or an official caution given instead of a penalty notice, about an alleged environmental offence; a caution does not of itself prevent a later penalty notice or prosecution.
Comes under: Protection of the Environment Operations Act 1997 (NSW) and, for an official caution, Fines Act 1996 (NSW), sections 19A and 19B
Compliance-cost noticeEPA & pollution regulationNSW EPA, council or another appropriate regulatory authority
A notice requiring payment of reasonable monitoring or compliance costs, public-authority clean-up costs, or costs of action following non-compliance with a prevention or prohibition notice.
Comes under: Protection of the Environment Operations Act 1997 (NSW), section 104
TimingTime limits commonly apply. Check the dates on the notice.
Environment protection licence decision or variationEPA & pollution regulationNSW EPA
A decision concerning the grant, conditions, variation, suspension, revocation or surrender of an environment protection licence.
Comes under: Protection of the Environment Operations Act 1997 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Court attendance notice or prosecutionEPA & pollution regulationNSW EPA, council or prosecuting authority
A court attendance notice or other process starting a prosecution for an environmental offence.
Comes under: Protection of the Environment Operations Act 1997 (NSW) and Land and Environment Court Act 1979 (NSW)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Civil enforcement proceedings, commenced or threatenedEPA & pollution regulationNSW EPA, council or another party
Proceedings in the Land and Environment Court to remedy or restrain a breach of environmental law, or a letter warning that they will be brought.
Comes under: Protection of the Environment Operations Act 1997 (NSW) and Land and Environment Court Act 1979 (NSW)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Contaminated land: preliminary investigation order, management order or ongoing maintenance orderEPA & pollution regulationNSW EPA
A notice, order or declaration concerning investigation, management, remediation or ongoing maintenance of contaminated land.
Comes under: Contaminated Land Management Act 1997 (NSW), sections 10, 11, 14 and 28
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
NRAR & water regulation15
Formal warning, show-cause letter or investigation noticeNRAR & water regulationNatural Resources Access Regulator
NRAR correspondence alleging or investigating a breach of NSW water law.
Comes under: Water Management Act 2000 (NSW) and Natural Resources Access Regulator Act 2017 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Notice requiring information, records or evidence (water law)NRAR & water regulationNatural Resources Access Regulator
A compulsory notice requiring information, documents, records or evidence about water take, water works or other water management conduct.
Comes under: Water Management Act 2000 (NSW) and Natural Resources Access Regulator Act 2017 (NSW)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Requirement to answer questions or attend an interview (water law)NRAR & water regulationNatural Resources Access Regulator
A requirement or request to answer questions or attend an interview during a water-law investigation.
Comes under: Water Management Act 2000 (NSW) and Natural Resources Access Regulator Act 2017 (NSW)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Direction concerning waste of waterNRAR & water regulationNatural Resources Access Regulator
A written direction requiring measures to prevent or address waste of water.
Comes under: Water Management Act 2000 (NSW), section 325
TimingTime limits commonly apply. Check the dates on the notice.
Metering installation, replacement or maintenance directionNRAR & water regulationNatural Resources Access Regulator
A direction requiring specified measures concerning water metering equipment.
Comes under: Water Management Act 2000 (NSW), section 326
TimingTime limits commonly apply. Check the dates on the notice.
Stop work order for a water management work, controlled activity or aquifer interference activityNRAR & water regulationNatural Resources Access Regulator
An order prohibiting, discontinuing or restricting the construction or use of a work, or a controlled activity or aquifer interference activity.
Comes under: Water Management Act 2000 (NSW), sections 327–328
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Direction to remove, modify or render a water management work ineffectiveNRAR & water regulationNatural Resources Access Regulator
A direction concerning a water management work for which no approval is in force, including removal, modification or dismantling. Section 329 does not authorise a direction concerning a water supply work used solely to take water under domestic and stock rights or to capture and store overland flow under harvestable rights.
Comes under: Water Management Act 2000 (NSW), section 329
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Temporary stop work order to protect public interestNRAR & water regulationNatural Resources Access Regulator
A temporary order prohibiting or restricting use of a work or the carrying out of an activity.
Comes under: Water Management Act 2000 (NSW), section 330
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Direction to protect or rehabilitate a water source or waterfront landNRAR & water regulationNatural Resources Access Regulator
A direction requiring measures to prevent, minimise, repair or rehabilitate adverse effects on a water source or waterfront land.
Comes under: Water Management Act 2000 (NSW), section 333
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Direction to protect the environment, public health or basic landholder rightsNRAR & water regulationNatural Resources Access Regulator
A direction to a landholder whose water supply work is used under domestic and stock rights or harvestable rights, or to whoever controls the work, to take specified measures to protect the environment, preserve basic landholder rights or overcome a threat to public health.
Comes under: Water Management Act 2000 (NSW), section 331
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Notice of intention to appoint a person to take remedial measuresNRAR & water regulationNatural Resources Access Regulator
Notice that the Minister intends to appoint a person to take remedial measures because the person directed refused or failed to take them. The appointed person may enter at a reasonable time, but premises used solely for residential purposes require the occupier's consent. They must do as little damage as possible. The Minister must compensate damage caused by entry, excluding damage resulting from the occupier hindering, intimidating or obstructing the person. Remedial costs and expenses are recoverable as a debt to the Ministerial Corporation.
Comes under: Water Management Act 2000 (NSW), sections 336G–336L (Chapter 7, Part 1, Division 9)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Compliance cost notice for the costs of a directionNRAR & water regulationNatural Resources Access Regulator
A written notice requiring a person given a direction to pay the costs and expenses the Minister reasonably incurred for preparing and giving the direction, monitoring compliance with it and other matters the regulations prescribe. It must specify the amount and a reasonable period, not less than 28 days, to pay it. An unpaid amount can be recovered as a debt.
Comes under: Water Management Act 2000 (NSW), section 336A
TimingTime limits commonly apply. Check the dates on the notice.
Water-law report, records or compliance-audit requirementNRAR & water regulationNatural Resources Access Regulator
A direction or notice requiring a report, records, monitoring material or a compliance audit concerning water management conduct.
Comes under: Water Management Act 2000 (NSW), sections 326A and 334 (compliance audit and report directions) or section 338A (notice requiring information or records), as applicable
TimingTime limits commonly apply. Check the dates on the notice.
Water access licence or approval decisionNRAR & water regulationWater NSW, NRAR or the responsible Minister
A decision concerning a water access licence, water supply work, water use, controlled activity or aquifer-interference approval.
Comes under: Water Management Act 2000 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Water-law penalty notice, civil penalty proceedings or prosecutionNRAR & water regulationNatural Resources Access Regulator
An enforcement action alleging a breach of NSW water law.
Comes under: Water Management Act 2000 (NSW)
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Roads, access & infrastructure5
Roads Act section 138 consent refusal, conditions or compliance actionRoads, access & infrastructureCouncil, Transport for NSW or another roads authority
A decision or compliance action about carrying out work in, on or over a public road, including opening, occupying or connecting to the road.
Comes under: Roads Act 1993 (NSW), section 138 and the instrument identified in the notice
TimingTime limits commonly apply. Check the dates on the notice.
Notice of entry for survey, investigation or road workRoads, access & infrastructureTransport for NSW or another roads authority
A notice that a roads authority or authorised person proposes to enter land for investigation, survey or road purposes.
Comes under: Roads Act 1993 (NSW), Part 11 (entry to land) and the power identified in the notice
TimingTime limits commonly apply. Check the dates on the notice.
Temporary occupation, access or works noticeRoads, access & infrastructureTransport for NSW or another roads authority
A notice or proposal to occupy or use land temporarily for road or infrastructure works. Under section 175 of the Roads Act 1993, a roads authority must ordinarily give at least 7 days' written notice before it uses and occupies land for road work, and a person given the notice may appeal to the Minister, by a written notice of appeal specifying the grounds, within 7 days after receiving it. The notice ordinarily goes to the occupier. Use or occupation within 15 metres of a dwelling requires the occupier's written consent or the Minister's written authority. The roads authority must compensate the owner for resulting loss or damage.
Comes under: Roads Act 1993 (NSW), section 175, or the project-specific enabling Act identified in the notice
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Proposed road closure, dedication, opening or realignment noticeRoads, access & infrastructureRoads authority, council or Crown Lands
A proposal or decision affecting the legal status, alignment or public use of a road or road reserve.
Comes under: Roads Act 1993 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Utility or infrastructure access noticeRoads, access & infrastructureElectricity, water, telecommunications or infrastructure provider
A statutory or contractual notice seeking access for inspection, maintenance, construction or operation of infrastructure.
Comes under: The utility-specific enabling Act and any easement or agreement identified in the notice
TimingTime limits commonly apply. Check the dates on the notice.
Compulsory acquisition4
Proposed Acquisition NoticeCompulsory acquisitionAcquiring authority
Formal notice that an authority proposes to acquire land by compulsory process.
Comes under: Land Acquisition (Just Terms Compensation) Act 1991 (NSW), section 11
General timing informationA Proposed Acquisition Notice (section 11) generally must run for at least 90 days before acquisition (section 13(1)), subject to the shorter-period exceptions. It also asks an owner wishing to claim compensation to lodge a claim within its stated period, which must be at least 60 days after the notice is given. A claim and a later Court objection are separate steps.
Acquisition notice or gazettalCompulsory acquisitionAcquiring authority
Notice that land has been compulsorily acquired and vested in the acquiring authority.
Comes under: Land Acquisition (Just Terms Compensation) Act 1991 (NSW), sections 19–20
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Offer to acquire the land by agreementCompulsory acquisitionAcquiring authority
A letter from an acquiring authority offering to acquire the land, or an interest in it, by agreement, before any compulsory acquisition.
Comes under: Land Acquisition (Just Terms Compensation) Act 1991 (NSW)
TimingTime limits commonly apply. Check the dates on the notice.
Compensation notice or Valuer-General determination: identify the documentCompulsory acquisitionAcquiring authority or Valuer-General
The acquiring authority's compensation notice states the compensation offered after acquisition, based on the Valuer-General's determination. The 90-day objection period generally runs from receipt of that compensation notice, not the separate Valuer-General determination. An amended notice can change the statutory receipt date; the Court may hear a late objection for good cause.
Comes under: Land Acquisition (Just Terms Compensation) Act 1991 (NSW)
General timing informationUnder the Just Terms Act, a person who has claimed compensation may generally object by lodging an objection with the Land and Environment Court within 90 days after receiving the authority's compensation notice (section 66(1)), not the Valuer-General's separate determination. An amended notice can affect the date used for the statutory period. The original notice, amendment and dates need to be checked together. If neither acceptance nor objection occurs in time, the offer is generally taken to be accepted (section 45); a late objection requires good cause (section 66(3)).
Biodiversity, heritage & Commonwealth6
Heritage stop work order, interim heritage order or order to remedy a failure to maintain or repairBiodiversity, heritage & CommonwealthMinister, Heritage Council or its Chairperson (Heritage NSW under delegation), or an authorised council
A Heritage Act order that stops work on a heritage item for 40 days (a stop work order or an order restricting harm), protects it for up to 12 months (an interim heritage order), or requires it to be maintained and repaired. An interim heritage order generally takes effect on Gazette publication and lasts 12 months, or a shorter stated period, unless revoked sooner. An affected owner or occupier may appeal a council-made interim heritage order, generally within 28 days after it takes effect; an appeal does not itself stay the order.
Comes under: Heritage Act 1977 (NSW), Part 3 and sections 79C, 120 and 136
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Rural native vegetation clearing: stop work order, remediation order or other noticeBiodiversity, heritage & CommonwealthBiodiversity regulator (the Environment Agency Head), the EPA or another responsible agency
A notice or direction alleging unlawful clearing of native vegetation in a rural area, or requiring work to stop or the land to be remediated.
Comes under: Local Land Services Act 2013 (NSW), Part 5A, enforced under the Biodiversity Conservation Act 2016 (NSW), Part 11, or the instrument identified in the notice
TimingAct promptly. Notices of this kind often carry short time limits or immediate obligations.
Tree or vegetation clearing in a non-rural area: council letter or allegationBiodiversity, heritage & CommonwealthLocal council
A council ‘stop clearing’ letter, or an allegation that trees or other vegetation were cleared in a non-rural area without the authority required.
Comes under: State Environmental Planning Policy (Biodiversity and Conservation) 2021 (NSW), Chapter 2
TimingTime limits commonly apply. Check the dates on the notice.
EPBC Act environment protection order, audit or notice to produceBiodiversity, heritage & CommonwealthCommonwealth environment regulator or Minister
Commonwealth correspondence about compliance with the EPBC Act or an approval’s conditions, including an audit, an information request or enforcement action.
Comes under: Environment Protection and Biodiversity Conservation Act 1999 (Cth)
TimingTime limits commonly apply. Check the dates on the notice.
EPBC Act referral, controlled-action or approval decisionBiodiversity, heritage & CommonwealthCommonwealth environment regulator or Minister
A Commonwealth decision on a referral, including whether a proposed action is a controlled action, or an approval decision and its conditions.
Comes under: Environment Protection and Biodiversity Conservation Act 1999 (Cth)
TimingTime limits commonly apply. Check the dates on the notice.
Another notice, order, direction, refusal or official letterBiodiversity, heritage & CommonwealthAny government authority or regulator
Use this where the instrument is not listed or you are not yet sure which authority or statutory pathway applies.
Comes under: The enabling Act and instrument require identification
TimingTime limits commonly apply. Check the dates on the notice.
The Notice Decoder is part of the Matter Navigator. For a full structured briefing across planning, environment, acquisition and local government matters, Continue in Matter Navigator →
What usually happens next, by notice: EPA notices, council notices and orders and Proposed Acquisition Notices.
Can’t find it?
Can’t find your notice in the list?
Tell us which document you received, who issued it and any date it states. We can discuss whether the firm can assist and the next step.
30 minutes · Phone or Teams · No charge
The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.