Hunter Transmission Project

Transmission and energy · Hunter · EnergyCo NSW

Documented stage: Procurement / delivery

Profile publication reviewed . Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

Project overview

The Hunter Transmission Project is a new overhead 500 kV transmission line of about 110 kilometres between Bayswater in the Upper Hunter and Olney in the Lower Hunter. The project has conditional approvals and is in procurement, with construction expected in 2027.

Infrastructure and approvals

The project includes new switching stations and upgrades to the Bayswater and Eraring substations. The NSW Government granted planning approval on 27 July 2026. Commonwealth approval was granted on 9 September 2026, subject to conditions, under EPBC 2024/09874.

Procurement and expected construction

Transgrid is the preferred network operator. Tenders for the two main design and construction packages are under way, and EnergyCo expects construction to start in 2027.

Easement acquisition and widths

EnergyCo says it has begun the formal easement acquisition process under the Land Acquisition (Just Terms Compensation) Act 1991 and that negotiations with affected landholders are ongoing. It describes construction within a temporary easement of about 140 metres, with a permanent easement of around 70 metres.

Gazetted construction leases and easements

On 7 August 2026 EnergyCo gazetted compulsory acquisitions of construction leases for road upgrades whose lease terms name the Hunter Transmission Project, in NSW Government Gazette No 317. EnergyCo also gazetted compulsory acquisitions of 140 metre construction and access easements on 31 July and 18 September 2026, in Nos 305 and 381. Those two notices do not name a project.

What this could mean for a property

Transmission projects are usually delivered through easements over private land rather than full acquisition. With NSW planning approval granted on 27 July 2026 and Commonwealth approval granted on 9 September 2026, subject to conditions, EnergyCo has begun the formal easement acquisition process, has gazetted a compulsory acquisition of construction leases for the project, and says negotiations with affected landholders are ongoing, so compulsory acquisition is possible where agreement is not reached. A property being near the approved corridor does not mean it will be affected, but the easement terms, access conditions, construction impacts and compensation are worth understanding before agreeing to anything.

Key things to watch

  • Whether your land is within or near the approved corridor
  • Any easement offer, negotiation or formal acquisition notice from EnergyCo
  • The easement terms, width and compensation
  • What happens if an agreement is not reached

Possible land impacts

  • Transmission easements over private and rural land along the corridor
  • Survey, geotechnical and construction access
  • Construction compounds, temporary occupation and access tracks
  • Severance and land-use effects within and near the easement

Possible impact types

  • Easement
  • Survey / investigation access
  • Construction lease
  • Temporary occupation
  • Access change
  • Severance / retained land
  • Planning / corridor constraint

Documents worth gathering

  • Any easement, option or land-access agreement offered
  • Your title search and deposited plan
  • Farm and business records, if relevant
  • Correspondence and maps from the project

Location and relevant interests

Council areas: Muswellbrook, Singleton, Cessnock, Lake Macquarie, Central Coast.

Often relevant to: Rural and regional landholders along the corridor; Owners hosting or adjoining the easement; Lessees and farm businesses.

Official sources

Project record checked

Project information is indicative. It does not establish that a particular property is affected.

Find this project on the Project Watch hub

Where to start

Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

Request a call back

Speak with a lawyer

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

Speak with a lawyer Call