Infrastructure projects that may affect land in Hunter
16 of the 142 projects on NSW Project Watch are in Hunter, across 10 council areas. Each is listed below by the stage it has reached, with its agency and a link to its profile.
Project information is indicative. It does not establish that a particular property is affected. Last checked .
Early investigation: 2 projects
-
John Renshaw Drive upgrade, Black Hill
Early investigation Road Transport for NSW
Council areas: Newcastle.
John Renshaw Drive upgrade, Black Hill is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with a listed value of $250M to $500M. Transport for NSW says the project, with $15 million from the Australian and NSW governments for planning, will investigate options for the John Renshaw Drive and Weakleys Drive intersection at Beresfield and for Weakleys Drive, and that construction timing is not confirmed.
-
Maitland Westbound Overpass
Early investigation Road Transport for NSW
Council areas: Maitland.
Maitland Westbound Overpass is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with no value published. Transport for NSW is investigating a westbound upgrade of the New England Highway at the Cessnock Road roundabout, which the NSW Government described in August 2026 as a $100 million westbound flyover funded by the Australian Government. Geotechnical and survey investigations started on 31 August 2026 for up to three months, and Transport says it is still developing a proposed solution for community consultation.
Corridor / option identified: 3 projects
-
Hunter train manufacturing facility, Teralba
Corridor / option identified Rail and metro Transport for NSW
Council areas: Lake Macquarie.
On 20 October 2026 the NSW Government identified former mining land at Teralba as the preferred location for a new state-owned train manufacturing facility under the Future Fleet Program. Further investigations, planning and land acquisition arrangements are continuing. Broadmeadow remains an alternative. Preferred-site selection does not establish planning approval or completed acquisition.
Read the Hunter train manufacturing facility, Teralba profile
-
Lower Hunter Freight Corridor
Corridor / option identified Ports, freight and logistics Transport for NSW
Council areas: Lake Macquarie, Newcastle, Cessnock.
A protected corridor for a future dedicated freight rail line of about 30 kilometres between Fassifern and Hexham, designed to take freight trains around Newcastle's urban areas. Transport for NSW says the corridor alignment was refined after community consultation in 2021 and protected in 2022. Its December 2022 Strategic Environmental Assessment describes protection by rezoning the corridor land to SP2 Infrastructure and notes that about 65 per cent of the corridor is already in NSW Government ownership.
-
Newcastle Future Transit Corridor
Corridor / option identified Rail and metro Transport for NSW
Council areas: Newcastle.
A corridor for future rapid bus or light rail services between Newcastle Interchange and the Broadmeadow precinct, along Tudor and Belford streets. Transport for NSW identified a preferred section between Newcastle Interchange and Hunter Street, and in 2025 that section was rezoned to SP2 Infrastructure under the State Environmental Planning Policy (Transport and Infrastructure) 2021, with Transport for NSW identified as the authority to acquire land in the corridor if it is required.
Planning and assessment: 4 projects
-
Chichester Trunk Gravity Main replacement, Brookfield Tunnel to Burmi Creek
Planning and assessment Water and utilities Hunter Water
Council areas: Dungog, Port Stephens, Maitland.
Hunter Water plans to replace a 12 kilometre section of the Chichester Trunk Gravity Main between Brookfield Tunnel and Burmi Creek, a pipeline that supplies around 40 per cent of the Lower Hunter's drinking water and was built in 1923. North of Wallaroo Creek the larger replacement pipeline would generally follow the existing corridor, while further south it would divert around Columbey National Park, mainly within an existing cleared powerline easement. The concept design and review of environmental factors were on public exhibition from 7 September to 4 October 2026, and Hunter Water is reviewing the submissions before a determination is made, with project approval and detailed design expected from late 2027 and construction from 2029, subject to approval.
Read the Chichester Trunk Gravity Main replacement, Brookfield Tunnel to Burmi Creek profile
-
Nelson Bay Road Improvements
Planning and assessment Road Transport for NSW
Council areas: Port Stephens.
Nelson Bay Road Improvements is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with a listed value of $250M to $500M. In August 2026 Transport for NSW set aside the 2021 preferred route and adopted a three-stage plan: a new four-lane road between Salt Ash and Bobs Farm, staged duplication between Fern Bay and Williamtown, and safety upgrades between Williamtown and Salt Ash, with some safety works expected from 2027. Transport says it will engage with potentially affected property owners about the land needed.
-
Newcastle Link Road / Minmi Road intersection upgrade
Planning and assessment Road Transport for NSW
Council areas: Lake Macquarie.
Newcastle Link Road / Minmi Road intersection upgrade is listed in the NSW Major Projects Infrastructure Pipeline as a project in planning, with a listed value of $100M to $250M. A preferred design replacing the roundabout with a grade separated interchange has been identified, and Transport for NSW is preparing the concept design and review of environmental factors.
Read the Newcastle Link Road / Minmi Road intersection upgrade profile
-
Newcastle Logistics Precinct
Planning and assessment Ports, freight and logistics EnergyCo NSW
Council areas: Newcastle.
Newcastle Logistics Precinct is listed in the NSW Major Projects Infrastructure Pipeline as a commercial project in planning, with a listed value of $100M to $250M. EnergyCo's environmental impact statement for the precinct, on the government-owned Intertrade site at the Port of Newcastle, was exhibited until 26 August 2026 and is at the response to submissions stage. Three contractors are shortlisted and EnergyCo expects construction to begin in 2027.
Approved / committed: 1 project
-
Mandalong Road upgrade, Morisset
Approved / committed Road Transport for NSW
Council areas: Lake Macquarie.
Mandalong Road upgrade, Morisset is listed in the NSW Major Projects Infrastructure Pipeline as a transport project at the design stage, with a listed value of $50M to $100M. The Australian and NSW governments are investing $76 million in the upgrade. Transport for NSW published the review of environmental factors in May 2025, finalised the detailed design in September 2026 and is moving to major construction procurement, with construction expected to start in early to mid 2027 and take around two years. Transport has said property acquisition will be required and that it has contacted the owners concerned.
Procurement / delivery: 3 projects
-
Hunter Transmission Project
Procurement / delivery Transmission and energy EnergyCo NSW
Council areas: Muswellbrook, Singleton, Cessnock, Lake Macquarie, Central Coast.
The Hunter Transmission Project is a new overhead 500 kV transmission line of about 110 kilometres between Bayswater in the Upper Hunter and Olney in the Lower Hunter. The project has conditional approvals and is in procurement, with construction expected in 2027.
-
Muswellbrook Bypass
Procurement / delivery Road Transport for NSW
Council areas: Muswellbrook.
A New England Highway bypass of Muswellbrook in the Hunter. The project is in procurement, with early and enabling works under way (2026) and major construction expected to start in 2027; the design has been refined to reduce property acquisition.
-
Thornton bridge duplication
Procurement / delivery Road Transport for NSW
Council areas: Maitland.
Thornton bridge duplication is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with a listed value of $50M to $100M. Transport for NSW determined the review of environmental factors in April 2026 and carried out early work, including removal of the existing pedestrian bridge over the railway during a rail shutdown in May 2026. In October 2026 it awarded the design and construction contract, with work to start before the end of 2026 and completion expected in 2028. The assessment states that no permanent property acquisition is required, although temporary leases, licences or easements over adjacent land may be needed during construction.
Construction: 3 projects
-
Hunter Valley Flood Mitigation Scheme: Flood Repair Program
Construction Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)
Council areas: Maitland, Singleton, Muswellbrook, Upper Hunter, Dungog, Port Stephens, Newcastle.
Hunter Valley Flood Mitigation Scheme: Flood Repair Program is listed in the NSW Major Projects Infrastructure Pipeline as a water infrastructure project in planning, with a listed value of $50M to $100M. The department is repairing damage from the 2021 and 2022 floods, including bank protection at the Hannaway and Seaham levees and levee repairs at Hinton, with works notified to start between April and July 2026. Scheme assets are on private land, and repair works can involve access across private property and temporary site compounds. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.
Read the Hunter Valley Flood Mitigation Scheme: Flood Repair Program profile
-
Hunter-Central Coast Renewable Energy Zone (network infrastructure)
Construction Renewable Energy Zone EnergyCo NSW
Council areas: Cessnock, Singleton, Muswellbrook.
EnergyCo has commissioned Ausgrid to deliver the network for the Hunter-Central Coast Renewable Energy Zone by upgrading Ausgrid's existing poles and wires rather than building new ones: about 85 kilometres of sub-transmission lines between Kurri Kurri and Muswellbrook, two new energy hubs (substations), upgrades to existing substations and 18 kilometres of new underground fibre optic cable. Ausgrid exhibited a review of environmental factors from 29 April 2025 and has since determined that the project may proceed to construction, and EnergyCo signed the project development deed with Ausgrid in December 2025. EnergyCo reported the first stage complete on 21 May 2026, with construction continuing towards 1 gigawatt of network capacity by 2028.
Read the Hunter-Central Coast Renewable Energy Zone (network infrastructure) profile
-
Singleton Bypass (New England Highway)
Construction Road Transport for NSW
Council areas: Singleton.
An eight kilometre New England Highway bypass to the west of Singleton, crossing the Hunter River floodplain and taking through traffic around five sets of traffic lights in the town centre, with total Australian and NSW Government funding of $700 million. Major work started in early September 2024 and sections have progressively opened to traffic, including a third section at the northern end in July 2026. Transport for NSW expects the bypass to open to traffic in late 2026, weather permitting.
Council areas named by these projects
Central Coast, Cessnock, Dungog, Lake Macquarie, Maitland, Muswellbrook, Newcastle, Port Stephens, Singleton, Upper Hunter.
A council area is listed when a project's record names it; a project can affect land outside the areas its record names. To search by suburb, postcode or council, use the Project Watch map.
Where to start
Discuss a project or land concern
Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.
30 minutes · Phone or Teams · No charge
The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.