Milton Ulladulla Bypass

Road · Illawarra and South Coast · Transport for NSW

Documented stage: Planning and assessment

Profile publication reviewed . Individual source-check dates appear below. Inclusion does not establish that any particular property will be acquired or affected.

Project overview

A proposed 12 kilometre Princes Highway bypass to the west of the Milton and Ulladulla town centres on the South Coast, assessed as State significant infrastructure. The environmental impact statement was exhibited from 21 September to 19 October 2026, and the application is now at the response to submissions stage.

Assessment stage

The NSW Planning Portal shows application SSI-76796211 at the Response to Submissions stage. Transport for NSW says submissions have been published, that it is preparing a Response to Submissions report, and that the project will then go to the Department of Planning, Housing and Infrastructure for planning approval.

Design and connections

The concept design has three connections to the existing Princes Highway: a roundabout at Little Forest Road in the north, a grade separated interchange reached by an extension of Bishop Drive, and a roundabout near Canberra Crescent at Burrill Lake in the south. Slaughterhouse Road would end at the bypass on both sides, and Kings Point Drive would cross over it on a bridge with no ramps.

Funding and timing

Transport for NSW says the Australian and NSW governments have committed $940 million for planning and delivery. Its September 2026 answers to common questions say there is no definitive construction start date, that it anticipates construction starting in 2028 and likely taking four years, and that it is targeting late 2027 to award a contract for detailed design and construction.

What this could mean for a property

Transport for NSW says it has directly contacted owners of properties where an acquisition may be required, and that discussions about property acquisitions are continuing. It says discussions with some owners in the identified corridor began in late 2022, and that confirming the preferred option in September 2025 let it give owners more certainty about impacts. It also says residents near the central and southern connections may experience construction effects, and long-term changes to noise, views and access once the bypass opens. Not having been contacted does not, by itself, show that a property is unaffected. A project being planned near you does not mean your property will be acquired.

Key things to watch

  • Transport for NSW's response to submissions and any changes to the concept design
  • Whether your land is within the project footprint or a work area
  • Any survey, valuation or acquisition correspondence
  • Severance, access and retained-land effects

Possible land impacts

  • Whole or partial acquisition of land within the corridor
  • Severance and injurious affection for retained land
  • Changed property access and local road connections
  • Construction noise, vibration and amenity impacts

Possible impact types

  • Whole-property acquisition
  • Partial acquisition
  • Severance / retained land
  • Access change
  • Noise / vibration / amenity
  • Business disturbance
  • Planning / corridor constraint

Documents worth gathering

  • Any letter or notice from the project
  • Your title search and deposited plan
  • Valuation, rating or appraisal material
  • Business records, if a business is affected

Location and relevant interests

Council areas: Shoalhaven.

Often relevant to: Owners of land on or near the route options; Adjoining owners affected by a new corridor; Local businesses affected by access changes.

Official sources

Project record checked

Project information is indicative. It does not establish that a particular property is affected.

Find this project on the Project Watch hub

Where to start

Discuss your project or land concern

Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.

Request a call back

Speak with a lawyer

30 minutes · Phone or Teams · No charge

The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.

Speak with a lawyer Call