Infrastructure projects that may affect land in Illawarra and South Coast
14 of the 142 projects on NSW Project Watch are in Illawarra and South Coast, across 6 council areas. Each is listed below by the stage it has reached, with its agency and a link to its profile.
Project information is indicative. It does not establish that a particular property is affected. Last checked .
Early investigation: 7 projects
-
Bermagui Water Security Project
Early investigation Water and utilities DCCEEW Water Group (formerly Water Infrastructure NSW)
Council areas: Bega Valley.
Bermagui Water Security Project is listed in the NSW Major Projects Infrastructure Pipeline as a water infrastructure project in planning, with a listed value of $250M to $500M. It is a preliminary business case, jointly funded with the Australian Government, assessing options including changes to Brogo Dam's operating rules, a new or upgraded weir, upgrading the Brogo Dam wall and spillway, and a direct pipeline from Brogo Dam to the Brogo Water Treatment Plant. No option has been selected. Water Infrastructure NSW planned the project; the NSW Department of Climate Change, Energy, the Environment and Water says its Water Group now leads the development and delivery of the state's water infrastructure projects, and the project page sits on the department's water site.
-
Bulli Bypass
Early investigation Road Transport for NSW
Council areas: Wollongong.
A proposed bypass at Bulli in the Illawarra, listed by Infrastructure NSW as in planning (pre-construction), with route and corridor work at an early stage. Transport for NSW said in December 2025 that bypass options across the escarpment had been ruled out, that it would continue to explore options within the reserved road corridor and release a report on them in 2026, and that the bypass is not funded for construction.
-
Illawarra Renewable Energy Zone
Early investigation Renewable Energy Zone EnergyCo NSW
Council areas: Wollongong, Shellharbour.
A Renewable Energy Zone declared for the Illawarra region in February 2023, with an intended network capacity of 1 gigawatt. EnergyCo describes it as NSW's first urban REZ, drawing on existing infrastructure, spare government land and commercial roof space. Planning is at an early stage: EnergyCo is exploring options with Endeavour Energy and local industry, a community reference group met for the first time on 31 August 2026, and EnergyCo's project page does not identify a transmission corridor or network infrastructure project.
-
Mount Ousley Safety and Reliability
Early investigation Road Transport for NSW
Council areas: Wollongong.
Early planning by Transport for NSW to improve the safety, reliability and resilience of about five kilometres of the M1 Princes Motorway between Picton Road and the Mount Ousley interchange. Transport says the project is in the early stages of investigating options, and feedback from consultation in late 2025 was summarised in a May 2026 report. Further planning and delivery are subject to future funding. This project is separate from the Mount Ousley Interchange, which is under construction.
-
Narooma Bridge and transport improvements study
Early investigation Road Transport for NSW
Council areas: Eurobodalla.
Transport for NSW's Narooma Bridge and Transport Improvements Study is investigating long-term options for Narooma Bridge and the Princes Highway through Narooma, including heavy vehicle access, congestion and safety. Consultation in 2024 sought views on retaining or upgrading the bridge, building a new bridge or planning for a future bypass. The study is expected to be completed in mid 2027, and no preferred option has been announced.
Read the Narooma Bridge and transport improvements study profile
-
Nowra Bypass
Early investigation Road Transport for NSW
Council areas: Shoalhaven.
A proposed bypass of Nowra on the South Coast, listed by Infrastructure NSW as in planning (pre-construction), with route and corridor work at an early stage.
-
Picton Road upgrade: Almond Street, Wilton to M1 Princes Motorway
Early investigation Road Transport for NSW
Council areas: Wollondilly, Wollongong.
Planning for the central and eastern sections of the Picton Road upgrade, from Almond Street, Wilton to the M1 Princes Motorway interchange. Transport for NSW says these sections are at the shortlist options phase, with preferred options expected by late 2026, when the community will be invited to comment. Survey and geotechnical investigations have been carried out along the corridor and on land next to Picton Road. Timing and funding for construction are not confirmed.
Read the Picton Road upgrade: Almond Street, Wilton to M1 Princes Motorway profile
Corridor / option identified: 1 project
-
Moruya Bypass (Princes Highway)
Corridor / option identified Road Transport for NSW
Council areas: Eurobodalla.
A proposed two-lane, nine kilometre bypass of Moruya on the South Coast, to the east of the existing Princes Highway. In July 2024 Transport for NSW identified a refined Orange corridor as the preferred option and said the corridor will be reserved for future construction.
Planning and assessment: 5 projects
-
Dapto Ramps
Planning and assessment Road Transport for NSW
Council areas: Wollongong.
Dapto Ramps is listed in the NSW Major Projects Infrastructure Pipeline as a transport project in planning, with no value published. In May 2026 Transport for NSW confirmed Fowlers Road as the preferred option for new south-facing ramps on the M1 Princes Motorway at Dapto, and a concept design and environmental assessment are being prepared for public display. Its May 2026 FAQs say the Fowlers Road option may impact up to 80 properties, including homes and businesses, from the ramps, construction areas and noise walls, and that no property acquisition would occur until construction funding has been granted. The 2026-27 NSW Budget provides $21.9 million; timing and funding for construction are not confirmed.
-
Jervis Bay Road to Hawken Road
Planning and assessment Road Transport for NSW
Council areas: Shoalhaven.
A proposed upgrade of about 6.5 kilometres of the Princes Highway between Jervis Bay Road, Falls Creek and Hawken Road, Tomerong, to two lanes in each direction separated by a median. The review of environmental factors was displayed from 14 May to 19 June 2026, and Transport for NSW says a determination report responding to submissions will be released in the coming months. Its project materials state that the proposal would require the total acquisition of six properties and the partial acquisition of 43 properties, with construction expected around 2028.
-
Milton Ulladulla Bypass
Planning and assessment Road Transport for NSW
Council areas: Shoalhaven.
A proposed 12 kilometre Princes Highway bypass to the west of the Milton and Ulladulla town centres on the South Coast, assessed as State significant infrastructure. The environmental impact statement was exhibited from 21 September to 19 October 2026, and the application is now at the response to submissions stage.
-
Shellharbour Treatment Plant Upgrade
Planning and assessment Water and utilities Sydney Water
Council areas: Shellharbour.
Shellharbour Treatment Plant Upgrade is listed in the NSW Major Projects Infrastructure Pipeline as a project in planning, with a listed value of $100M to $250M. Sydney Water lists upgrades at the existing Shellharbour treatment plant, with scope optimisation under way; it has not announced delivery timing or published a project page.
-
Wollongong Treatment Plant Upgrade
Planning and assessment Water and utilities Sydney Water
Council areas: Wollongong.
Wollongong Treatment Plant Upgrade is listed in the NSW Major Projects Infrastructure Pipeline as a project at the design stage, with a listed value of $250M to $500M. Sydney Water plans to increase the treatment capacity of the existing Wollongong Water Resource Recovery Facility, with investment approval expected in 2027 and completion in 2034.
Procurement / delivery: 1 project
-
Tripoli Way extension, Albion Park
Procurement / delivery Road Shellharbour City Council
Council areas: Shellharbour.
Shellharbour City Council is extending Tripoli Way at Albion Park to create a continuous route from Terry Street in the east to the Illawarra Highway at Broughton Avenue in the west, bypassing the Albion Park town centre. The environmental impact statement was determined in September 2024 and electrical and utility relocation works have been carried out since 2025. On 26 August 2026 the Council and the NSW Government announced that the main construction contract had been awarded to Haslin Constructions, with main works expected to start in late 2026. A notice of compulsory acquisition of land by the Council for the project was published in the NSW Government Gazette on 18 September 2026.
Council areas named by these projects
Bega Valley, Eurobodalla, Shellharbour, Shoalhaven, Wollondilly, Wollongong.
A council area is listed when a project's record names it; a project can affect land outside the areas its record names. To search by suburb, postcode or council, use the Project Watch map.
Where to start
Discuss a project or land concern
Tell us what has happened and what decision you need to make. The preliminary call is to discuss whether Stone & Pillar can assist and the next step. If we can assist, scope and fees are agreed before substantive legal work begins.
30 minutes · Phone or Teams · No charge
The complimentary 30-minute preliminary call is intended to discuss whether we can assist and what an initial scope of work would involve. It is not intended to provide legal advice. Ask us to confirm in writing the work we have agreed to undertake.